Quit nicotine pouches without going cold turkey.

A taper that adapts to you, with no willpower cliffs. Day one has no restrictions: just log what you already do.

Join the TestFlight betaFree · iOS · No account
The Unpouch Gate screen: the gate is open and a Took one button is ready
Logging

Two taps. That’s the whole job.

Log every pouch: Took one when it goes in, Removed it when it comes out. The app does the rest.

Both taps sit where your eyes already are, so logging never means opening an app. Unpouch uses the deepest system-level surfaces iOS offers to take the friction out, so a tap is never lost and always keeps its true timestamp.

Brand-agnostic: Zyn, On!, Velo, Rogue, Lucy. You’re logging a pouch, not a product.

How it works

Five phases. You never pick one.

Each phase hands off to the next automatically as you hit its exit condition. Comfortable runs finish around day 50; harder ones take longer. Both are success states.

01 · Observe · Days 1–3

Three days of just watching.

Use pouches exactly like you normally do and log each one. The app measures your baseline: how many per day, and how long you keep them in. Nothing is restricted yet.

Unpouch onboarding screen explaining the Observe phase
02 · Cap · If one's usually in

Shorter pouch times first.

Before spacing pouches out, the app shrinks how long each one stays in, about 10% per step, never below 30 minutes. You're building the habit of deliberate removal and real gaps. Stay on-plan for 80% of doses across three days and the Taper begins.

Unpouch onboarding screen explaining the Gate
03 · Taper · The main stretch

The Gate.

After each pouch a countdown starts, and it grows a little every day. Taking one early is noted, but it doesn't punish you. No penalty, no reset. The schedule simply holds.

Day 0: one every 50 min · Day 28: every 3 h · Day 42: every 6.5 h

The Gate screen with a countdown until the next pouch
04 · Endgame · At about 2 a day

A real quit date.

The interval gate is replaced by a small daily allowance that shrinks toward a calendar quit date, seven days out. Use them whenever you like. Once today's allowance is gone, the gate stays shut until tomorrow.

05 · Quit · Around day 54

The gate stays closed.

After your quit date the app becomes a streak counter: days since your last pouch. A rough day restarts a seven-day landing, never the whole program.

Unpouch onboarding screen explaining progress you keep
Built for rough days

Progress you keep.

The ratchet

Your ratchet is the longest gap you’ve already proven. It only ever tightens, and rough days, speed changes, and pauses never loosen it. Progress you’ve made is progress you keep.

No penalties

Taking one early is noted, but it doesn’t punish you. No resets, no shame. And the first pouch of the day is always free and the gate never blocks it.

Panic pause

A rough day happens. Panic pause freezes the gate and the schedule for 24 hours: no targets, no early doses, ratchet untouched. Available once a week.

Progress

Watch the taper happen.

Your plan, your longest gaps, a heat calendar of every day, and an estimated nicotine curve scaled to your own typical peak.

“A rough model from what you logged, not a measurement.” In the app’s own words. These are not blood levels.

On-device logYour doses never upload
No accountNothing to sign up for
Yours to keepOne-tap JSON export
FreeNo subscription
Questions

Before you start.

Does Unpouch work with Zyn, On!, Velo, Rogue, and Lucy?
Yes. Unpouch is brand-agnostic: you log a pouch, not a product, so Zyn, On!, Velo, Rogue, Lucy, FRE, Juice Head and Nordic Spirit all work the same way. Strength doesn't change how the taper runs either: the estimated nicotine curve is scaled to your own typical peak rather than to a milligram number on the can.
How do I quit Zyn without going cold turkey?
You stretch the gap between pouches instead of stopping all at once. Unpouch spends the first few days measuring how you actually use pouches today, then lengthens the interval between them by about 5% a day, slow enough that most days feel like the one before. At around two pouches a day it gives you a real quit date, seven days out. Read the full guide, with a sample taper schedule.
How long does it take to quit nicotine pouches with a taper?
A comfortable run finishes around day 50. Slowing the pace down or taking pauses makes it longer, and that's a success state too. Unpouch never resets your progress to punish a slow week. The longest gap you've already proven is yours to keep.
Is tapering better than quitting nicotine pouches cold turkey?
Unpouch doesn't claim it is. Cold turkey works for plenty of people. A taper exists for everyone who has tried a hard stop, bounced off it, and wants something that doesn't hinge on one heroic day of willpower. For advice about your own situation, talk to a clinician. Unpouch schedules, it never advises.
Can I use Unpouch for snus, dip, or chewing tobacco?
It's built for nicotine pouches, and snus behaves the same way, so that works. Dip and chew are a looser fit: the app assumes one discrete dose that goes in and comes out on a timer, and it has no way to reason about portion size.
Is Unpouch free, and is there an Android version?
It's free, with no subscription and no account to create. It runs on iOS 17 and up, because the lock screen Live Activity and Dynamic Island countdown are central to how it works and those are iOS-only. Android may come later.

The schedule bends so you don’t quit the app.

Join the TestFlight beta

Free · iOS 17+ · No account · Your log stays on your phone